0 of 1 Questions completed
Questions:
Information
You have already completed the exercise before. Hence you can not start it again.
You must sign in or sign up to start the exercise.
You must first complete the following:
Exercise complete. Results are being recorded.
0 of 1 Questions answered correctly
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
-
Current
-
Review
-
Answered
-
Correct
-
Incorrect
-
Question 1 of 1
Navigate to the HPE Partner Ready Portal and login using your HPE Passport credentials
- Navigate to Tools and select One Config Advanced
- Click on the Normal button
- Enter the Configuration Name as Primera for Test Company
- In the Select Product field, type Primera
- Select HPE Primera 600 4-way Storage Base
- Click on the Create button
The components which are marked with a red error must be corrected before a valid quote can be created.
- Click on Configure Controller Pair
- Select HPE Primera A670 1TB 4-node Controller
(The 1TB refers to the amount of cache.)
- Which HBAs have been automatically chosen by OCA?
- Which cables have been automatically chosen by OCA?
- Is a backup solution included?
- Is installation included?
- Which switches are included?
- Make some changes to the configuration, ensuring that the overall Config Status is not red.
- Click on the BOM tab.
- What is the lead time on the components of this solution?
- Click on the Services tab.
- What services are included by default?
Grading can be reviewed and adjusted.
Grading can be reviewed and adjusted.